The Massachusetts Department of Transportation announces the following in connection with the Braga Bridge:
MassDOT will close an additional lane of I-195 eastbound on the Braga Bridge during the following dates and times:
- Thursday, September 17 – from 8:00 PM to 6:00 AM on Friday, September 18
- Friday, September 18 – from 9:00 PM to 10:00 AM on Saturday, September 19
One eastbound travel lane will remain open during this work, and the two travel lanes on the westbound side of the bridge will remain in the current configuration. During non-construction work hours, two lanes of traffic will be maintained in both directions.
The closures are necessary to set the barrier between the high speed and right lanes to establish a new work zone.
For more information about the Braga Bridge closure visit the Massachusetts Department of Transportation website.
Comments are closed.